Performance and cost improvements force the development and implementation of new fasteners into production. Total internal company organization participation is essential. Industry cooperation and use can be vital to economic success. Production feasibility tests to establish installation costs and production suitability must be established. These include: cost of inventory of existing on-going system; cost of surplus; tool cost for changeover; floor space required; inventory of parts in process; and cost of installation. Technical solutions should be flexible to minimize personal bias of participants.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Implementation of New Fasteners Into Production


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:

    Kongress:

    National Aerospace Engineering and Manufacturing Meeting ; 1973



    Erscheinungsdatum :

    1973-02-01




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch






    FASTENERS

    GOKAVI MAHANTESH / JADHAV SATISH / DESAI RAVINDRA et al. | Europäisches Patentamt | 2020

    Freier Zugriff

    FASTENERS INTEGRATED INTO A VEHICLE FRAME

    HALL STEPHEN | Europäisches Patentamt | 2015

    Freier Zugriff

    Fasteners for ease of production

    Narraway,R. | Kraftfahrwesen | 1984