To support a 90-day surface mission for two robotic rovers, the Mars Exploration Rover mission designed and implemented an intensive tactical operations process, enabling daily commanding of each rover. Using a combination of new processes, custom software tools, a Mars-time staffing schedule, and seven-day-a-week operations, the MER team was able to compress the traditional weeks-long command-turnaround for a deep space robotic mission to about 18 hours. However, the pace of this process was never intended to be continued indefinitely. Even before the end of the three-month prime mission, MER operations began evolving towards greater sustainability. A combination of continued software tool development, increasing team experience, and availability of reusable sequences first reduced the mean process duration to approximately 11 hours. The number of workshifts required to perform the process dropped, and the team returned to a modified 'Earth-time' schedule. Additional process and tool adaptation eventually provided the option of planning multiple Martian days of activity within a single workshift, making 5-day-a-week operations possible. The vast majority of the science team returned to their home institutions, continuing to participate fully in the tactical operations process remotely. MER has continued to operate for over two Earth-years as many of its key personnel have moved on to other projects, the operations team and budget have shrunk, and the rovers have begun to exhibit symptoms of aging.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    From Prime to Extended Mission: Evolution of the MER Tactical Uplink Process


    Beteiligte:

    Kongress:

    AIAA SpaceOps Conference ; 2006 ; Rome, Italy


    Erscheinungsdatum :

    2006-06-19


    Medientyp :

    Preprint


    Format :

    Keine Angabe


    Sprache :

    Englisch






    Preparing Cassini Uplink Operations for Extended Mission

    Maxwell, Jennifer / McCullar, Michelle / Conner, Diane | AIAA | 2008


    Reengineering the Mission Operations System for the Prime and Extended Mission

    Hunt, J.C. / Cheng, L.Y. / American Institute of Aeronautics and Astronautics | British Library Conference Proceedings | 2013


    Reengineering the Mission Operations System for the Prime and Extended Mission

    Schmidhuber, Michael / Cruzen, Craig / Kehr, Joachim | AIAA | 2013