There is a need to know a great deal more about Life-Cycle costs for weapon systems and their subsystems. Direct costs for development, procurement and operations have continued to spiral upward at an increasing rate. Of particular interest are the Life-Cycle costs of new generation avionics subsystems in contemporary weapon systems. These new avionics have high procurement costs, higher support costs and even appear to dominate the weapon system maintenance costs. This report is concerned with the difficulties that characterize contemporary Avionics Life-Cycle Analysis. The uncertainty associated with estimating avionics life-cycle costs is related to the life-cycle stages of weapon systems. (Modified author abstract)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Problems in Avionics Life-Cycle Analysis


    Beteiligte:
    M. R. Fiorello (Autor:in)

    Erscheinungsdatum :

    1973


    Format / Umfang :

    21 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Avionics life-cycle forecasting model

    Czerwonka, Stephen P. (Stephen Paul), 1976- | DSpace@MIT | 2000

    Freier Zugriff


    Avionics Proliferation: A Life Cycle Cost Perspective

    R. M. Genet / T. D. Meitzler | NTIS | 1975


    A Systems Approach - Minimizing Avionics Life Cycle Cost

    Berger, Robert L. | SAE Technical Papers | 1983


    Avionics built-in-test effectiveness and life cycle cost

    PALAZZO, C. / ROSENFELD, M. | AIAA | 1983