In 1966 the Bell Helicopter Company (BHC) commenced the development of an artillery-prime mover version of the UH-1 helicopter. Concurrently, BHC also began developing the dynamic components for a 2000 shaft horsepower (shp) drive system. In early 1968, a converted model UH-1C with increased horsepower, larger rotor blades and additional modifications was first flown and introduced as the BHC Model 211 (Hueytug). The prototype Hueytug was designed to transport sling loads weighing up to 6000 pounds at a design take-off gross weight of 14,000 pounds. The Hueytug is also designed for battlefield recovery of downed aircraft, command and control, medical evacuation and resupply missions. The US Army Aviation Systems Test Activity was directed by the US Army Aviation Systems Command to perform an Army Preliminary Evaluation (APE) on the prototype BHC Model 211 (Hueytug).


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Army Preliminary Evaluation of the Prototype BHC Model 211 (Hueytug)


    Beteiligte:
    T. K. Wright (Autor:in) / I. W. Rundgren (Autor:in) / J. I. Nagata (Autor:in)

    Erscheinungsdatum :

    1969


    Format / Umfang :

    104 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Army Preliminary Evaluation Prototype Hughes Model 369C (OH-6C) Helicopter

    G. L. Skinner / A. Deel / R. D. McClellan | NTIS | 1972



    Army Preliminary Evaluation I. Model 200 CEFLY LANCER

    G. M. Yamakawa / T. P. Benson / L. K. Brewer et al. | NTIS | 1974


    Army Preliminary Evaluation II. Model 200 CEFLY LANCER

    G. M. Yamakawa / T. P. Benson / L. K. Brewer | NTIS | 1974


    Army Preliminary Evaluation Preproduction OV-1D (Mohawk)

    W. A. Graham / G. M. Yamakawa / T. K. Wright | NTIS | 1970