The F/A-18E/F program began, in 1992 to increase the operational capabilities of the current fleet of F/A-18 aircraft. The objectives of the program are to provide Improved capabilities over current F/A-18s in five key areas-range, payload, carrier recovery payload, growth capacity; and survivability. Congress capped the development effort at $4.88 billion (in fiscal year 1990 dollars) and directed that the E/F unit procurement cost not exceed 125 percent of current CID model costs. The F/A-18E/F development flight test program began in February 1996. Two early operational assessments of the E/F aircraft, using wind tunnel data and analytical models, were made in early 1996 and 1997. Two operational assessments of the E/F aircraft, based on data obtained during test flights using the engineering and manufacturing development aircraft, were conducted in November 1997 (OT-IIA) and in June through August 1998 (OT-IIB). The Navy's Operational Test and Evaluation Force (OPTEVFOR) conducted these assessments.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Defense Acquisitions: Progress of the F/A-18E/F Engineering and Manufacturing Development Program


    Erscheinungsdatum :

    1999


    Format / Umfang :

    28 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch