Two orbital test plans were prepared to verify one of the passive cryogenic storage tank/feedline candidate designs. One plan considered the orbital test article to be launched as a dedicated payload using an Atlas F burner launching configuration. The second plan proposed to launch the orbital test article as a secondary payload on the Titan E/Centaur proof flight. The secondary payload concept was pursued until January 1973, when work to build the hardware for this phase of the contract was terminated for lack of a sponsor for the flight. The dedicated payload launched on an Atlas F is described. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Acquisition/Expulsion System for Earth Orbital Propulsion System Study. Volume 4: Flight Test Article


    Erscheinungsdatum :

    1973


    Format / Umfang :

    192 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch