Costs for airline operational implementation of a NASA-developed approach energy management system (AEMS) concept, as applied to the 727 airplane, were determined. Estimated costs are provided for airplane retrofit and for installation of the required DME ground stations. Operational costs and fuel cost savings are presented in a cost-of-ownership study. The potential return on the equipment investment is evaluated using a net present value method. Scheduled 727 traffic and existing VASI, ILS, and collocated DME ground station facilities are summarized for domestic airports used by 727 operators.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    AEMS Implementation Cost Study for Boeing 727


    Beteiligte:
    R. L. Allison (Autor:in)

    Erscheinungsdatum :

    1977


    Format / Umfang :

    89 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Airborne Engine Monitoring System (AEMS) for the PS 90-engine

    Inozemtsev, A.A. / Beboutov, G.G. / Walle, G. | Tema Archiv | 1998


    Boeing 747 Training Developments and Implementation

    Tate, B. M. | SAE Technical Papers | 1971


    Boeing 747 - 400 FANS - 1 Implementation

    Abe, Y. | British Library Online Contents | 1996


    Implementation of New Technology - A Boeing Perspective

    Ekstrand, Chet | SAE Technical Papers | 1990