The invention discloses bow anchor weighing equipment for offshore wind power operation, which comprises a ship body, a bow is arranged on the right side of the ship body, a bow deck is arranged on the upper surface of the bow, a stern is arranged on the left side of the ship body, a stern deck is arranged on the upper surface of the stern, a propeller is arranged at the bottom of the stern, and a cabin is arranged above the middle of the ship body. The cabin is located between the bow and the stern, an operation and maintenance crane is arranged on the rear side of the surface of the bow, a first machine arm and a second machine arm are connected and installed above the operation and maintenance crane, a lifting claw is installed at the tail end of the second machine arm, two anchor gears are arranged above the bow, and anchor chain bodies are connected and installed in the anchor gears; the right side of the anchor chain body penetrates through the through groove, and an anchor head is fixedly installed at the tail end of the anchor chain body. According to the bow anchor weighing equipment for offshore wind power operation, in the installation stage, anchor weighing and dropping operation, towing and equipment part transportation are integrated, the anchor weighing use of a tugboat is reduced, and therefore manpower is reduced, and the anchor weighing time is saved.

    本发明公开了一种用于海上风电作业的艏部起锚设备,包括船体,所述船体右侧设置有船艏,且船艏上表面设置有艏甲板,所述船体左侧设置有船艉,且船艉上表面设置有艉甲板,并且船艉底部设置有螺旋桨,所述船体中间上方设置有船舱,且船舱位于船艏和船艉之间,所述船艏表面后侧设置有运维吊机,且运维吊机上方连接安装有第一机臂和第二机臂,并且第二机臂末端安装有吊爪,所述船艏上方均设置有两个锚机,且锚机内部连接安装有锚链本体,所述锚链本体右侧贯穿于通槽,且锚链本体末端固定安装有锚头。该用于海上风电作业的艏部起锚设备安装阶段起锚抛锚作业、拖带、设备零部件运输一体化,减少拖船的起锚使用从而减轻人力,节约起锚时间。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Bow anchor weighing equipment and method for offshore wind power operation


    Weitere Titelangaben:

    一种用于海上风电作业的艏部起锚设备及方法


    Beteiligte:
    SUN YANG (Autor:in) / WEI LI (Autor:in) / CHEN JIANLIN (Autor:in) / XU JIN (Autor:in)

    Erscheinungsdatum :

    2024-04-09


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS



    Electric anchor weighing winch

    TANG WEIPING / TANG ZHIHANG / TANG ZHIXUAN | Europäisches Patentamt | 2023

    Freier Zugriff


    Anchor weighing method using tidal range

    WANG HUAIGANG / WANG PENG / MA YINGSHAN et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Connecting structure of anchor buoy and anchor weighing method

    LIAO JUNFENG / LIU ZHENGLIANG | Europäisches Patentamt | 2021

    Freier Zugriff

    ANCHOR CASTING AND WEIGHING DEVICE

    Europäisches Patentamt | 2015

    Freier Zugriff