The invention discloses a tower crane installation construction process which comprises the following steps: step 1, preparation before installation of a construction site, step 2, preparation before installation of a construction tower crane, step 3, planning of an equipment entrance route and preparation of an on-site site, step 4, verification of tools, step 5, configuration of a power supply, step 6, configuration of a foundation, and step 7, construction of a tower crane. And mounting the tower crane. The first step further comprises the following steps that 101, construction tower cranes are reasonably arranged according to the overall construction organization design, and 102, the site is cleaned at the position of the main tower on the water building side according to the construction plan, and temporary assembly of entering parts is facilitated. According to the construction technology for tower crane installation, guidance is provided for the tower crane during installation construction, then it is guaranteed that the tower crane can be more standard and reasonable during construction, it is guaranteed that the construction period is conducted smoothly, and it can also be guaranteed that the tower crane is more stable and durable after installation is completed.

    本发明公开了一种塔吊安装的施工工艺,包括以下步骤,步骤一,施工现场的安装前准备,步骤二,施工塔吊安装前的准备,步骤三,设备入场路线的规划及现场场地的准备,步骤四,工具的核验,步骤五,电源的配置,步骤六,地基的配置,步骤七,塔吊的安装。所述步骤一还包括以下步骤,步骤101,根据整体施工组织设计对施工塔吊进行合理布置,步骤102,根据施工计划在建水侧主塔处清理场地,方便进场零部件的临时拼装。本发明提供了一种塔吊安装时的施工工艺,为塔吊在安装施工的时候,提供指引,进而保证了塔吊在施工的时候,能够更加有规范合理,不仅保证了工期顺利进行,而且还能保证塔吊在安装完成后,更加稳固耐用。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Construction process for tower crane installation


    Weitere Titelangaben:

    一种塔吊安装的施工工艺


    Beteiligte:
    WAN HUI (Autor:in) / LI HE (Autor:in)

    Erscheinungsdatum :

    2023-08-01


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    B66C Krane , CRANES



    Tower crane buttress installation construction method

    ZHANG ZHAO / ZHANG FENG / WANG QIAO et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Tower crane installation construction method and installation equipment thereof

    YAN XUTONG / JIN DACHUN / MA XIAOBAO et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Installation and construction method of underwater tower crane

    SHEN JIANCHUAN / TANG YUJIAN / WEI GAN et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Intelligent early warning tower crane installation construction method

    SONG LIANGLIANG | Europäisches Patentamt | 2022

    Freier Zugriff

    Telescopic quick installation tower crane

    YIN CHENBO / TONG XIN / WANG JUN et al. | Europäisches Patentamt | 2020

    Freier Zugriff