The invention relates to an overcrossing railway under construction deep cutting road bridge double-machine collaborative hoisting system and method. A crane A (2) and a crane B (3) are arranged at abridge site hoisting region; a preset beam field is arranged beside a bridge site; a gun carrier for conveying a beam piece (1) to the hoisting region is arranged between the beam field and the bridgesite; a hoisting point A (9) corresponding to the crane A (2) and a hoisting point B (10) are preset at the two ends of the beam piece (1); an intermediate span is preset in the middle of a bridge pier (4); side spans (6) are arranged at the two ends of the middle span (5); a cutting top is arranged on a bridge upper station (8) on the side span (6); and when the beam body (1) of the side span (6) is mounted, a slope platform is set as a conversion station (7) midway. The overcrossing railway under construction deep cutting road bridge double-machine collaborative hoisting system is reasonable in design, compact in structure and convenient to use.
本发明涉及上跨在建铁路深路堑公路桥梁双机协同吊装系统及方法,在桥址吊装区域处的起重机A(2)与起重机B(3),桥址旁设预设梁场,在梁场与桥址之间设置有用于运送梁件(1)至吊装区域的炮车;在梁件(1)两端预设预设有与起重机A(2)对应的A吊点(9)及与起重机B(3)对应的B吊点(10);在桥墩(4)中间预设有中间跨(5),中间跨(5)两端设置有边侧跨(6),在边侧跨(6)将堑顶设置为桥梁上工位(8),在安装边侧跨(6)的梁体(1)的时候,在中途将边坡平台设置为转换工位(7);本发明设计合理、结构紧凑且使用方便。
Overcrossing railway under construction deep cutting road bridge double-machine collaborative hoisting system and method
上跨在建铁路深路堑公路桥梁双机协同吊装系统及方法
2020-09-29
Patent
Elektronische Ressource
Chinesisch
Auxiliary hoisting device for traffic road and bridge construction
Europäisches Patentamt | 2021
|Devise novel composite deck for highway overcrossing
Engineering Index Backfile | 1937
Highway-railway dual-purpose bridge deck hoisting device and hoisting method thereof
Europäisches Patentamt | 2023
|