Installation of rope suspended belt haulage system in Carlsbad, NM, potash mine to complement already existing rail transport arrangement; since first belt installation, belt has been used whenever mining height standard was below minimum height for rail haulage, which has been fixed at 6 ft; in addition, excessive bed grades have influenced use of belt; advantages and limitations of both systems; proposed changes in haulage in mine. (See also Soc Min Engrs -- Trans v 226 n 1 Mar 1963 p 53-6)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Rail-belt Haulage system


    Weitere Titelangaben:

    Min Eng


    Beteiligte:
    Johnston, C.E. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1963


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Rail-belt Haulage system

    Johnston, C.E. | Engineering Index Backfile | 1963


    Rail haulage

    Pearse, G. | Tema Archiv | 1995


    Rail haulage at climax

    Cleeves, C.A. | Engineering Index Backfile | 1957


    Third-rail tail-rope haulage system

    Logan, L.L. | Engineering Index Backfile | 1903


    The aerial rail hoist and haulage system

    Crane, W.R. | Engineering Index Backfile | 1905