Method of welding "Ribbonrail" continuous sections of rail, making up two track lengths of 2300 ft each, to be placed in eastbound and westbound main line tracks through Toronto, Hamilton and Buffalo Railway Co tunnel at Hamilton, Ont; work is done by automatic oxyacetylene pressure welding machine. (See also Can Machy v 63 n 11 Nov 1952 p 157-60, 169)
Pressure welding of continuous rail
Can Transportation
1952
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Pressure welding of continuous rail
Engineering Index Backfile | 1952
Engineering Index Backfile | 1945
Progress in rail pressure welding
Engineering Index Backfile | 1950
|Gas pressure rail welding on Konkan Railway
Online Contents | 1995
In-track pressure rail welding in China
IuD Bahn | 2005
|