Necessity for eliminating excess middle sizes, or "belly" sizes, requires producer to make and ship sand in two separate size divisions, but also requires that split between sizes be accurate within 5% limits; practice at American Aggregates Corp plant.
Shipping sand in two sizes
Rock Products
Rock Products ; 48 , n 4
1945
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1958
|Online Contents | 2005
Online Contents | 2003
Online Contents | 2001