Illustrated article describes construction of vehicular and pedestrian tunnel under Maas River, Rotterdam, Holland; design features use of 9 prefabricated concrete sections 81 × 28 × 201 ft, that were sunk and connected under water with aid of 81-ft diving bell; capacity of tunnel cited as 12 million vehicles, 32,000 pedestrians and 3200 bicycles per yr; underwater and overall lengths are 1926 and 3528 ft respectively.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Precision control is sinking prefabricated sections for Maas tunnel


    Weitere Titelangaben:

    Eng News-Rec


    Erschienen in:

    Erscheinungsdatum :

    1946


    Format / Umfang :

    5 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Arbeitsgruppe Hochwasser Maas (AHM). Aktionsplan Hochwasser Maas

    Internationale Maaskommission (IMK) | HENRY – Bundesanstalt für Wasserbau (BAW) | 2002

    Freier Zugriff

    Forms of MaaS

    Ackermann, Malte | Springer Verlag | 2021


    The MaaS Paradigm

    Williams, Bob | Wiley | 2021


    MaaS bundle design

    Reck, Daniel J. / Hensher, David A. / Ho, Chinh Q. | Elsevier | 2020


    Changing the Maas mix

    Online Contents | 1995