Large coal shiploading facility under construction at Conneaut, Ohio, is intended to make coal production independent of seasonal lake transportation; railroad schedules will no longer have to coincide with coal ship schedules; coal handling system will include 3600 tph stockpiling system and 5000 tph shiploading system; stockpiling system includes six track hoppers, 60 in. belt conveyor and traveling stacker; reclaiming is accomplished by bucketwheel coal reclaimer and by two reclaiming hoppers.
Coal production and rail shipment freed from ship schedules on great lakes
Coal Today Tomorrow
Coal -- Today and Tomorrow ; 19 , n 3
1965
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Diesel-electric ship for great lakes
Engineering Index Backfile | 1926
Passenger ship for Great lakes trade
Engineering Index Backfile | 1959
Distinctive C.G.T. ship for great lakes
Engineering Index Backfile | 1959
Ship building on the Great Lakes
Engineering Index Backfile | 1892
Kraftfahrwesen | 2008
|