New York, New Haven and Hartford Railroad utilized arc welding in repairing four-track through-plate girder bridge on main line at Darien, Conn.; work consisted in welding on new top cover plates and also in welding cracks.
Repairing railway bridge girders by welding on new cover plates
Eng. News-Rec
Engineering News Record ; 103 , n 13
1929
2 pages
1 Fig.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Fatigue behaviour of steel plated railway bridge girders
British Library Conference Proceedings | 2003
|Repairing all-metal railway coaches by welding
Engineering Index Backfile | 1931
|Removal of girders on the Kiul bridge on the East Indian Railway
Engineering Index Backfile | 1912
Bridge Girders with Corrugated Webs
Online Contents | 2000
|Bridge Girders with Corrugated Webs
Online Contents | 2000
|